Here they are setting up
The chute for the old shingles from the roof to the truck
Removing the old shingles
Putting down the underlayment
Shingle delivery with conveyor belt to the peak
Hauling the 6.5 tons of shingles from the conveyor belt to their roof location
They were very considerate of our plants.
2 comments:
You have a lot of angles and joins for them to do. I remember the noise when I had my roof done in 2003.
we did that to that last year went with green tin
Post a Comment